Description
Hoists used as temporary installations during building construction work which are primarily intended for the carriage of personnel but which may also carry materials. The hoist cage suspension is either by steel wire ropes or by rack and pinion with a maximum speed of 2 m/s.
Cross References:
BS 228
BS 302
BS 329
BS 436:Part 2
BS 436:Part 3
BS 449:Part 2
BS 545
BS 639
BS 709
BS 721:Part 1
BS 721:Part 2
BS 800
BS 2573:Part 1
BS 2853
BS 3790
BS 4360
BS 4395:Part 1
BS 4395:Part 2
BS 4395:Part 3
BS 4604:Part 1
BS 4604:Part 2
BS 4604:Part 3
BS 5135
BS 5304
BS 5486:Part 1
BS 5490
BS 5655:Part 1
BS 7212
CP 3:Chapter V:Part 2
IEE Regulations for Electrical Installations
Health and Safety at Work etc. Act 1974
Factories Act, 1961
Factories Act (Northern Ireland) 1965
Wireless Telegraphy Act, 1949
Lifting machinery (Particulars of Examinations) Order 1963
Ship building and Ship Repairing Regulations 1960
Construction (Lifting Operations) Regulations 1961
Construction (Lifting Operations) Certificates Order 1962
Construction (Lifting Operations) Certificates (Amendment) Order 1964
Construction (Lifting Operations) Reports Order 1962
Construction (Lifting Operations) Prescribed Particulars Order 1962
Construction (Lifting Operations) Prescribed Particulars (Amendment) Order 1962
Construction (General Provisions) Regulations 1961
Construction (Working Places) Regulations 1966
Electricity (Factories Act Special Regulations 1908 and 1944
Shipbuilding and Ship Repairing Regulations (Northern Ireland 1960
Construction (Lifting Operations) Regulations (Northern Ireland) 1963
Product Details
- Published:
- 01/31/1990
- ISBN(s):
- 0580178579
- Number of Pages:
- 60
- File Size:
- 1 file , 1.4 MB
- Product Code(s):
- 00207591, 00207591, 00207591