NBBI NB23-2017 Part 3

$75.00

Format: PDF      In Stock

 

Sale!
-50%

NBBI NB23-2017 Part 3

$75.00

National Board Inspection Code – NBIC, 2017 Edition – Part 3 – Repairs and Alterations
standard by National Board of Boiler and Pressure Vessel Inspectors, 2017

Format: PDF      In Stock

 

Category:

NOTE: Our website provide PDF immediately download, sometimes when the payment is processed and you did not receive the file, please feel free to connect with us.

Description

The NBIC recognizes three important areas of post-construction activities where information, understanding,and following specific requirements will promote public and personal safety. These areas include:

  • Installation
  • Inspection
  • Repairs and Alterations

The NBIC provides rules, information, and guidance for post-construction activities, but does not providedetails for all conditions involving pressure-retaining items. Where complete details are not provided in thiscode, the code user is advised to seek guidance from the Jurisdiction and from other technical sources.

The words shall, should, and may are used throughout the NBIC and have the following intent:

  • Shall – action that is mandatory and required.
  • Should – indicates a preferred but not mandatory means to accomplish the requirement unless specifiedby others such as the Jurisdiction.
  • May – permissive, not required or a means to accomplish the specified task.

Product Details

Published:
2017
ANSI:
ANSI Approved
File Size:
1 file , 5.5 MB